Friedland's Ivanhoe picks up the pace in DRC

November 08, 2022 / www.mining-journal.com / Article Link

The Kamoa-Kakula project in the Democratic Republic of the Congo has produced at an annualised rate of over 400,000t of floated and filtered copper for the second month in a row.

Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok