URANIUM: Denison extends high grade Huskie zone at Waterbury Lake

By Canadian Mining Journal / September 19, 2017 / www.canadianminingjournal.com / Article Link

Map of the final summer drill holes at Waterbury Lake. (Credit: Denison Mines)

SASKATCHEWAN - With the final summer drill holes, Toronto-based Denison Mines Corp. says it has extended the high grade Huskie zone at the Waterbury Lake uranium project in the Athabasca Basin. The high grade, basement-hosted mineralization has now been expanded to 100 metres along strike, and it remains open in both directions.

The company noted these highlights from the final holes: 1.0% uranium oxide over 7.6 metres, including 4.6% eU3O8 over 1.4 metres in drill hole WAT17-449, and 0.8% eU3O8 over 7.9 metres, including 3.3% eU3O8 over 1.0 metre and 1.3% eU3O8 over 1.0 metre in hole WAT17-450A.

The Huskie zone is interpreted as being geologically similar to the Roughrider and J zones a kilometre to the south. As of Dec. 31, 2016, the J zone at Waterbury Lake contained 291.0 million indicated tonnes grading 2.0 eU3O8.

Denison has a 63% interest in the Waterbury project. The balance is held by Korea Waterbury Uranium LP. Information is available at www.DenisonMines.com.

Recent News

Gold stocks gain even as metal price pulls back

April 29, 2024 / www.canadianminingreport.com

Copper price forecast swinging significantly on shifting outlook

April 29, 2024 / www.canadianminingreport.com

Upgrades continue for 2024 gold price target...

April 22, 2024 / www.canadianminingreport.com

Gold stocks edge up as weak equities offset metal rise

April 22, 2024 / www.canadianminingreport.com

Major investment banks make major gold price upgrades

April 15, 2024 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok