THIS NEWS RELEASE IS NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES FOR DISSEMINATION IN THE UNITED STATES VANCOUVER, BC / ACCESS Newswire / August 13, 2026 / Algo Grande Copper Corp. ("Algo Grande" or the "Company") (TSXV:ALGR)(OTC PINK:ALGRF)(FRA:KM00) announces a non-brokered private plac...Read More
AG_CG_PH2_002 (Hole 2) copper zone continues to expand: a newly logged interval has grown Hole 2's copper-bearing footprint to 68.77 metres of visually observed mineralization across a 154-metre span, more than double what was reported previously, reinforcing the scale of the discovery benea...Read More
at Cerro Grande: Hole AG_CG_PH2_003 ("Hole 3") has commenced drilling at the Cerro Grande skarn target, collared approximately 100 metres along strike from the Phase I discovery hole, AG_GC_002 (see news release here), and planned to a total depth of 450 metres.Hole 3 objectives: confirm and...Read More
Second drill rig mobilized to site: a second, track-mounted drill rig has arrived at the Adelita Project and is being set up to run concurrently with the first rig, expected to increase the overall pace of the Phase II program.AG_CG_PH2_002 (Hole 2) intersects 28.37 metres of copper minerali...Read More