Highlights Drill hole NC17-257 returned exceptional near-surface results with a 15.0m intersection grading 7.2% Zn Eq. including 9.0m of 11.1% Zn Eq. from a starting depth of 113.0m; Hole NC17-255 intersected 21.0m of 2.8% Zn Eq. including 9.0m of 5.5% Zn Eq. at a starting depth of 118.0m; and T...Read More
Highlights Callinex completes maiden drilling campaign at the Big Island Project and intersects 7.9m of 2.5% Zn and 0.42 g/t Au; Borehole surveys identified a geophysical target with a strike extent of 450m and a plunge extent of 675m at the Tara Lake Deposit; and Drilling expanded the historic...Read More
Highlights Callinex completes maiden drilling campaign at the Big Island Project and intersects 7.9m of 2.5% Zn and 0.42 g/t Au; Borehole surveys identified a geophysical target with a strike extent of 450m and a plunge extent of 675m at the Tara Lake Deposit; and Drilling expanded the historic...Read More
VANCOUVER, Jan. 3, 2018 /CNW/ - Callinex Mines Inc. (the "Company" or "Callinex") (TSX-V: CNX; OTCQX: CLLXF) is pleased to provide its year-end letter to shareholders from President and CEO, Max Porterfield: Dear Shareholders, I want to thank you on behalf of our entire team...Read More
VANCOUVER, Jan. 3, 2018 /PRNewswire/ - Callinex Mines Inc. (the "Company" or "Callinex") (TSX-V: CNX; OTCQX: CLLXF) is pleased to provide its year-end letter to shareholders from President and CEO, Max Porterfield: Dear Shareholders, I want to thank you on behalf of our entir...Read More
Highlights Drill hole SJ17-88 intersected 1.9m of massive sulphides grading 8.0% zinc equivalent mineralization in the newly discovered D Zone at the Superjack Project; A recently completed 44km surface pulse electromagnetic survey indicates there may be potential to expand mineralization at dep...Read More
VANCOUVER, Oct. 26, 2017 /CNW/ - Callinex Mines Inc. (the "Company" or "Callinex") (TSX-V: CNX; OTCQX: CLLXF) is pleased to announce that it has signed agreements to acquire over 150 acres of private land covering a significant portion of the Company's Nash Creek Deposit located in the Bathur...Read More
VANCOUVER, Oct. 11, 2017 /CNW/ - Callinex Mines Inc. (the "Company" or "Callinex") (TSX-V: CNX; OTCQX: CLLXF Callinex is pleased to announce that it has appointed John J.(JJ) O'Donnell as the Company's Vice President of Exploration. Mr. O'Donnell has over 30 years of experience in e...Read More
VANCOUVER, Oct. 11, 2017 /PRNewswire/ - Callinex Mines Inc. (the "Company" or "Callinex") (TSX-V: CNX; OTCQX: CLLXF Callinex is pleased to announce that it has appointed John J.(JJ) O'Donnell as the Company's Vice President of Exploration. Mr. O'Donnell has over 30 years of experien...Read More
Highlights Drill Hole SJ17-90 intersected 2.7m of massive sulphides grading 6.2% Zn Eq. (4.4% Zn, 0.9% Pb, 0.3% Cu and 17.5 g/t Ag) at a starting depth of 40.4m including 0.5m of 20.4% zinc; The new mineralized VMS horizon has been intersected in a second drill hole approximately 100m verticall...Read More
Highlights Drill Hole SJ17-90 intersected 2.7m of massive sulphides grading 6.2% Zn Eq. (4.4% Zn, 0.9% Pb, 0.3% Cu and 17.5 g/t Ag) at a starting depth of 40.4m including 0.5m of 20.4% zinc; The new mineralized VMS horizon has been intersected in a second drill hole approximately 100m verticall...Read More
Highlights Drill hole NC17-245 intersected 18.7m of 5.8% Zn Eq. including a higher grade interval of 5.0m grading 8.9% Zn Eq.; and NC17-245 was completed to test the theory that historic drilling intersected unreported mineralization due to inadequate sampling based on visual observations. VA...Read More
Highlights Drill hole NC17-245 intersected 18.7m of 5.8% Zn Eq. including a higher grade interval of 5.0m grading 8.9% Zn Eq.; and NC17-245 was completed to test the theory that historic drilling intersected unreported mineralization due to inadequate sampling based on visual observations. VA...Read More
Highlights Ten drill holes confirm the expansion of the Nash Creek Deposit 500m to the north, an increased strike length of approximately 35%; Additional drilling planned in 2017 to further expand the Nash Creek Deposit and deliver an updated resource estimate in Q4; and Plans to complete a PEA...Read More
Highlights The Campaign will test for additional mineralization related to the new zinc and gold-rich VMS discovery at the Pine Bay Project; A maiden drill campaign will be completed at the Tara Lake Deposit, which is one of the highest-grade zinc-rich discoveries within the Flin Flon Mining Dis...Read More
Highlights Land package covers 20 km long trend in prospective zinc-rich volcanogenic massive sulphide belt; Includes several high-grade base metal occurrences with reported assays up to 19% Zn+Pb along trend from the Company's Nash Creek Deposit; and The Company anticipates additional dril...Read More
Highlights Land package covers 20 km long trend in prospective zinc-rich volcanogenic massive sulphide belt; Includes several high-grade base metal occurrences with reported assays up to 19% Zn+Pb along trend from the Company's Nash Creek Deposit; and The Company anticipates additional dril...Read More
Highlights Drill hole NC17-226 intersected 9.0m of 5.2% Zn Eq. including 2.4m of 12.6% Zn Eq. within 20m of surface and located 350m north of the Nash Creek Deposit; Drill hole NC17-224 intersected 14.8m of 3.6% Zn Eq. including 2.7m of 6.9% Zn Eq. and 2.4m of 5.6% Zn Eq. within 100m of surface...Read More
Highlights Drill hole NC17-226 intersected 9.0m of 5.2% Zn Eq. including 2.4m of 12.6% Zn Eq. within 20m of surface and located 350m north of the Nash Creek Deposit; Drill hole NC17-224 intersected 14.8m of 3.6% Zn Eq. including 2.7m of 6.9% Zn Eq. and 2.4m of 5.6% Zn Eq. within 100m of surface...Read More
I had the chance to catch up with Max Porterfield, CEO of Callinex Mines. They've got a portfolio of very attractive zinc projects sporting intersections like 7.4m of 35% Zn Eq, 12.4m of 34% Zn Eq. and 19.6m of 24% Zn Eq. Those specific results were from the Big Island project that hasn't been drill...Read More