Contact MAU >Koné construction on-budget and ahead of schedule for Q4-2026 • Continued resource expansion • Robust liquidity sources KONÉ CONSTRUCTION ACTIVITIES ›Rapid progress achieved with +12.9 million hours worked to date, with +3,600 employees and contractors on-site›Well on track for first gold pour in Q4-2026 through the oxide circuit and on budget with $714.4 million of capital committed as at today, representing approximately 81% of the total upfront capital expenditure›Construction of all major infrastructure and equipment necessary for t...
HIGHLIGHTS: Wendé advanced greenfield exploration property, in Côte d’Ivoire, was awarded to Montage in December 2025 Over 60,000 meters of drilling was conducted on the property by previous owners, mainly on the Bobosso target which hosts a gold-in-soil anomaly covering an area of approximately 7km2 Over 6,500 meters drilled so far this year out of the 9,000-meter programme underway which confirmed the continuity of mineralization at the Bobosso target and extended its known mineralization Best selected intercepts from the ongoing drill program...
HIGHLIGHTS: A total of 39,963 meters have been drilled at the Didievi project subsequent to the publication of the June 2025 Inferred Mineral Resource Estimate for the Blaffo Guetto deposit of 989koz at 2.5 g/t Au1Drilling at the Blaffo Guetto deposit has extended mineralization along a strike of over 1.3km and down-dip, confirming the continuity of high-grade mineralized lenses, with select intercepts from the recent drilling programme including: BGDD26-090: 15.0 meters at 20.97 g/t Au from 127.0 meters and 12.5 meters at 4.75 g/t Au from 167.5 metersBGDD26-093: 27.4...