Noram Ventures Inc.

0.61

Canada & British Columbia Vancouver

1055 West Hastings Street, Suite 300

+1 604 428-0511

www.noramventures.com

Looking to explore investment opportunities with NRM?

Contact NRM >

Looking to explore investment opportunities with NRM?

Contact NRM >

Is this your business?
Customize your listing.

CLAIM THIS LISTING

Is this your business?
Customize your listing.

Noram Ventures Inc. graph

Company Press Releases

Noram Engages ABH Engineering to Complete Preliminary Economic Assessment of Zeus Property

VANCOUVER, BC / ACCESSWIRE / April 29, 2021 / Noram Ventures Inc. ("Noram" or the "Company") (TSX - Venture:NRM) (Frankfurt:N7R) (OTCQB:NRVTF) is pleased to announce that the Company has engaged ABH Engineering ("ABH"), a mineral processing engineering company offering design and optimization services to the mining sector, to complete a preliminary economic assessment of the Zeus Project.ABH Engineering is Canada's fastest growing mining engineering company, focused on mineral processing and advancing mining projects. ABH is currently performing severa...

Phase V Drill Program Concluded with Best Assay Results to Date

VANCOUVER, BC / ACCESSWIRE / April 23, 2021 / Noram Ventures Inc. ("Noram" or the "Company") (TSXV:NRM)(Frankfurt:N7R)(OTCQB:NRVTF) is pleased to announce the results from core hole CVZ-68 are the final assay results from Noram Ventures' Phase V drilling program. The hole provided what is believed to be the best assay results for the Zeus property to date. It contained 398 feet (121.0 m) from 109-506 feet (33.2-154.2 m) at an average grade of 1018 ppm Li. This interval included 250 ft (76.2 m) from 216-466 ft (65.8-142.0 m) with an average of 1151 ppm Li. Figure...

CVZ-67 Assays End at 502 FT (153 M) in LI Grade of 1220 PPM, Increasing with Depth

VANCOUVER, BC / ACCESSWIRE / April 21, 2021 / Noram Ventures Inc. ("Noram" or the "Company") (TSX - Venture:NRM / Frankfurt:N7R / OTCQB:NRVTF) is pleased to announce the assay results of CVZ-67, completed at a depth of 502 ft (153 m). The first 202 feet (61.6 m) were drilled through surface gravel before reaching the clay and mudstone units within the Esmeralda Formation. A 19-foot (5.8 m) thick section of brown sandy mudstone was intersected, followed by 11 feet (3.6 m) of tan claystone. From there on to the end of the hole, 232-502 feet (70.7-153 m), the hole pene...

See All >

Company News

See All >

Start Analyzing Junior Gold Mining Stocks

NEW EBOOK